• About
    • Company History
    • Core Values
    • Careers
    • UES Gives Back
    • Awards
    • Testimonials
    • UES Video
  • Our Team
  • Manufacturers
  • Territories
    • Alabama & FL Panhandle
    • Carolinas
    • Florida
    • Georgia
    • Virginia
    • International
    • Visitor Travel Information
  • Services
    • Energy & Engineering
    • Lighting Design
    • Marketing
    • Warehouses & Offices
    • Distributor Access 24/7
  • News
    • Blog
    • Press Releases
    • Industry Buzz
  • Contact
  • About
    • Company History
    • Core Values
    • Careers
    • UES Gives Back
    • Awards
    • Testimonials
    • UES Video
  • Our Team
  • Manufacturers
  • Territories
    • Alabama & FL Panhandle
    • Carolinas
    • Florida
    • Georgia
    • Virginia
    • International
    • Visitor Travel Information
  • Services
    • Energy & Engineering
    • Lighting Design
    • Marketing
    • Warehouses & Offices
    • Distributor Access 24/7
  • News
    • Blog
    • Press Releases
    • Industry Buzz
  • Contact

MGM Oil-Filled Transformers Keep Cities Moving

  • Dan Scoglio
  • 10/27/2026
  • Read Time: 5 min

Upgrading Under Pressure: How Custom MGM Oil-Filled Transformers Keep Cities Moving

When a Florida city needed to replace aging oil-filled transformers across a high-strain distribution network, time was the real enemy. Load growth from new development, steady electrification, and decades-old equipment had pushed the system to its limits. No realistic window existed to redesign primary or secondary lines, reconfigure switchgear interfaces, or open up civil work without pushing the project into the following year. The old units had to come out, and the new ones had to go in, leaving the existing infrastructure largely as-is. UES Energy & Engineering Solutions sees this kind of constraint more often as utilities and municipalities try to balance reliability, budgets, and real-world timelines.

Why High Strain Leaves Little Room for Redesign

Municipal systems rarely get the luxury of a clean slate. Older oil-filled transformers may still be in service long after their original design life, running closer to nameplate ratings as neighborhoods add load. When a failure or planned replacement arrives, the practical options shrink quickly. Pulling new conductors, resetting poles or pads, or rewriting protection coordination can add months and cost a lot. In many cases, the existing lines, terminations, and structural layouts have to stay. The transformer itself has to adapt.

Contractors and distributors who support these projects see the same pattern. The job looks straightforward on paper until the field measurements and existing nameplate data arrive. Voltage combinations, bushing locations, pad dimensions, and tap ranges do not always match current catalog standards. That is where a manufacturer willing to build to the site, rather than the other way around, becomes useful.

What MGM Brings to Oil-Filled Utility Replacements

MGM Transformers manufactures both liquid-filled and dry-type units. For outdoor municipal and utility duty, their liquid-filled distribution substation and padmount designs are common choices. These units are available in single- and three-phase configurations up to 10,000 kVA and 34.5 kV, with 46 kV optional on certain substation styles. Coolant options include mineral oil, silicone fluid, or fire-resistant FR3. The tanks use robust construction with pad-lockable, tamper-resistant compartments suited to public areas.

The practical advantage for municipalities is the ability to engineer the new unit to the existing footprint, bushing arrangement, tap settings, and connection points. Instead of forcing the site to adapt to a standard unit, MGM can size the core and coils, select the cooling method, and locate the terminals so the replacement behaves like a drop-in upgrade. That preserves the original protection coordination and keeps outage windows shorter. Oil-filled construction remains efficient for many outdoor applications because the fluid handles both insulation and heat transfer in a compact tank. With proper maintenance, the sealed design withstands Florida’s humidity and weather cycles.

In a recent Florida city project, matching those physical and electrical interfaces let the utility avoid the time and expense of re-engineering the lines. The new units went in on the existing pads and feeders. The city gained modern efficiency and reliability without redesigning the surrounding plant. That outcome is repeatable when the manufacturer’s engineering group is involved early and the rep channel keeps the communication loop short.

How UES Energy & Engineering Solutions Supported the Work

UES Energy & Engineering Solutions, led by Tom Holcombe and Dan Scoglio, handled the application side. The team reviewed the existing nameplate data, site constraints, and load profile, then coordinated with MGM to lock in the custom parameters before production. Because UES is MGM Transformers’ authorized representative in Florida and the Carolinas, the path from specification review to order stayed within one channel. Tom brings more than 25 years of controls and automation experience and works with specifying engineers, OEMs, and distribution partners on engineered power solutions. Dan supports the inside sales work that keeps drawings, questions, and delivery schedules moving. Together, they shorten the distance between the utility engineer, the contractor, and the factory.

eal-world utility upgrades rarely arrive with perfect data packages. A little humor helps when field notes arrive incomplete, or when the original drawings have long since disappeared into a filing cabinet no one admits to owning. The practical response is still the same: gather what is available early, flag non-standard voltages or footprints, and involve the manufacturer’s engineering group through the rep before the bid package closes. The result is usually a cleaner installation and fewer field changes.

Practical Steps for Contractors and Distributors

Contractors and distributors working on similar upgrades can follow the same approach. Document the existing transformer data, including primary and secondary voltages, kVA, impedance, and physical dimensions. Note any site limitations on pad size, access, or clearance. Share those details early so the manufacturer can confirm whether a custom match is feasible and what the lead time will be. MGM’s vertically integrated plants and programs such as Bull Rush (priority manufacturing for time-critical units) give additional options when schedules are tight. If the project also involves medium-voltage switchgear or submetering, UES Energy & Engineering Solutions can coordinate those pieces alongside the transformer work.

High system strain does not pause for ideal engineering conditions. When existing lines and structures must stay, the transformer must absorb the adaptation. Custom oil-filled designs that respect the original plant give cities a practical way to modernize without waiting for a complete rebuild. The Florida project showed that the approach works when the manufacturer and the local representative are aligned on both the technical match and the schedule.

About the Author
Dan Scoglio supports Inside Sales for UES Energy & Engineering Solutions. With extensive experience as an electrical contractor and in electrical distributor sales and management, he provides practical application support, coordinates technical reviews and order details, and helps keep complex power projects moving efficiently across the UES territory.

Dan Scoglio on LinkedIn

Further Reading:

Custom Designs That Fit Existing Substation Footprints

MGM Transformers utility solutions page
Learn More

Priority Manufacturing When Time Is Running Short

Inside the expedited Bull Rush Program
Learn More

Turnkey Support for Complex Power Projects

UES Energy & Engineering Solutions
Learn More
  • Privacy Policy
  • Terms and Conditions
  • Image Copyright Policy
  • Privacy Policy
  • Terms and Conditions
  • Image Copyright Policy
info@uesrep.com
Facebook-f Instagram Twitter Linkedin-in
Quarterly newsletter
Subscribe

Alabama

Phone 770-451-9146
Fax 770-451-9424

Mailing Address
5075 Peachtree Pkwy
Suite 107, PMB 111
Peachtree Corners, GA 30092

Carolinas

Phone 336-375-1122
Fax 336-375-0177

Warehouse/Office
4110 Pine Cone Drive
Greensboro, NC 27405

Florida

Phone 407-246-1992
Fax 407-246-1588

Mailing Address
13750 W. Colonial Drive
Suite 350, PMB 318
Winter Garden, FL
34787-4204

Georgia

Phone 770-451-9146
Fax 770-451-9424

Mailing Address
5075 Peachtree Pkwy
Suite 107, PMB 111
Peachtree Corners, GA 30092

Virginia

Phone 804-353-3144
Fax 804-353-3554

Warehouse/Office
10780 Old Washington Hwy
Building A
Glen Allen, VA 23060

© 2026 United Electrical Sales

Subscribe

"*" indicates required fields

Contact us Today!

This field is for validation purposes and should be left unchanged.

Contact us Today!

Contact us Today!

  • This field is for validation purposes and should be left unchanged.